欧美爱99,成年女人免费视频三区,丝袜人妖在线,欧洲站久久,日本黄色视频中文字幕,不卡日本二区三区,亚洲日韩人妻一二三区,欧美激情久久久骚,中文亚洲99

久草你在线观看,欧美日韩国产字幕导航,巨乳中文AV
 
  網(wǎng)站首頁 公司簡介 產品展示 工程展示 行業(yè)新聞 人才招聘 在線咨詢 聯(lián)系我們
 
 LED series
 Moving head light series
 Film and theatre lighting series
 Follow light series
 Outdoor light series
 Fog machines
 Strobe light series
 Stage light series
 Laser light series
 Controller series
 accessories series
 
News content
Stage lighting control analytical techniques
Source:ANDY         Time:2017-8-4 9:57:53

First: the auditorium stage lighting control in light bulbs cold state if the lighting control division who suddenly push light, it is likely to cause the bulb Bang " explosion; or cause tungsten fuse.

Faced with this problem we stage lighting control engineers should control techniques is when the bulb in the cold state ( before the opening front), will be a console fader only push a little ( say pressure light state ), so that the light bulb light, let it in the preheating state, so that the heat uniform, while evaporating condensation on the glass bulb shell of water molecules, preheating after a few minutes, and then push the brighter, and preheating after a few minutes, may be pushed fully bright lights.

Second: lighting control engineers must remember not to be dimming units fader chock full of state, and then open the silicon box power supply

If the control designers violate compasses operation, then the result is still the first problem of fault.

Third: stage lighting control engineers in switching equipment when don't will light control stage and silicon box power in reversed order

Incorrect operation in order to damage the equipment is the very normal matter, understand control technology friends this point should be very clear.

Fourth: in operation control lighting equipment when not in the light bulb to push, move shake lamps

This problem is very rare, lighting control division were also more clearly, we do not speak.

Fifth: avoid replacement bulbs, direct hand contact bulb, it will affect the smoothness of the bulb, and the other a recessive harm is led bulb explosion

In this step we adopt the operation skills in the replacement bulbs, must first put on the gloves, to contact with the lamp. If there is no gloves, available packing bulb sponge, plastic sheets or soft tissue wrapped, then the installation, installation must remember these inclusions down, in order to avoid pushing bright lamp fire.

Sixth: do not install the color changer and forgot to load protective net cover, protective net cover is to prevent the bulb explosion and burn things flying wounding

 Previous: The correct use of wireless microphone
 Next: Philips will exhibit a stage lighting solutions
  Links
 
About Us | News | Recruitment | Advisory | Contact Us
All rights reserved:Guangzhou Andy
粵ICP備17021536號-1    
兴文县| 宁波市| 永宁县| 建阳市| 汕头市| 华容县| 青岛市| 和政县| 蓬莱市| 紫云| 璧山县| 抚州市| 巴青县| 信阳市| 桃园县| 新余市| 永胜县| 迁西县| 海盐县| 宁陵县| 西昌市| 贺兰县| 东海县| 同仁县| 五寨县| 高密市| 南平市| 新余市| 仙居县| 南雄市| 兴安县| 普兰县| 镇巴县| 西林县| 安康市| 冕宁县| 宜昌市| 永嘉县| 临城县| 措勤县| 肥东县|